Skip to main content
Call Us
Email Us
Home

Contact Us

Face book social media link Houzz Logo (Original Colors) Pinterest Logo (Original Colors)
  • About
  • Books
  • Blog
  • Contact Us
  • Stitt Homes
    • Our Approach
    • Design Services
    • Building Your Home
      • Foundations
      • Walls
      • Windows
      • Doors
      • Roofs
      • Insulation & Air Sealing
    • Custom Home Project Gallery
    • FAQ
    • Why Build with Stitt?
  • Stitt Solar
    • Solar Energy Benefits
    • Steps to go Solar

You are here

  1. Green Building

Green Building

  • The finished entry welcomes family and friends.
  • The house site.
  • The footings are poured. Note the rebar protruding from the footing. This will tie the upper part of the structure to the footing.
  • Insulated concrete forms are stacked over the footings and ready for concrete. These stay-in-place forms surround the slab and provide an insulated - and warmer - floor.
  • Concrete is poured into the insulated concrete forms.
  • The slab is poured next.
  • Construction begins on the exterior walls for the main level.
  • Expanded floor trusses for the upper level floor.
  • The roof decking goes on.
  • The windows and house wrap are installed.
  • Real progress is being made now.
  • The ducts are sealed to prevent construction scraps and dust from getting in them.
  • The soybean-based spray foam insulation is sprayed by professional installers.
  • A blower door test is performed to locate any air leaks in the exterior walls. It is easy to fix them at this stage of construction.
  • The interior is beginning to look like someone could live here!
  • The home was tested by an independent, third party, certified home energy rater. It received a Five Star Plus rating which more than qualified it as an Energy Star Home.
  • The thoughtful landscaping uses drought resistant, native plants. Rain barrels capture water for use on plants if necessary.
  • The finished entry welcomes family and friends.
  • The house site.
  • The footings are poured. Note the rebar protruding from the footing. This will tie the upper part of the structure to the footing.
  • Insulated concrete forms are stacked over the footings and ready for concrete. These stay-in-place forms surround the slab and provide an insulated - and warmer - floor.
  • Concrete is poured into the insulated concrete forms.
  • The slab is poured next.
  • Construction begins on the exterior walls for the main level.
  • Expanded floor trusses for the upper level floor.
  • The roof decking goes on.
  • The windows and house wrap are installed.
  • Real progress is being made now.
  • The ducts are sealed to prevent construction scraps and dust from getting in them.
  • The soybean-based spray foam insulation is sprayed by professional installers.
  • A blower door test is performed to locate any air leaks in the exterior walls. It is easy to fix them at this stage of construction.
  • The interior is beginning to look like someone could live here!
  • The home was tested by an independent, third party, certified home energy rater. It received a Five Star Plus rating which more than qualified it as an Energy Star Home.
  • The thoughtful landscaping uses drought resistant, native plants. Rain barrels capture water for use on plants if necessary.
certified green professional logo
BBB Accredited logo
  • About
    • Our Team
    • Testimonials
    • Awards
    • Careers
  • Books
  • Blog
  • Contact Us
  • Stitt Homes
    • Our Approach
    • Design Services
    • Building Your Home
    • Custom Home Project Gallery
    • FAQ
    • Why Build with Stitt?
  • Stitt Solar
    • Solar Energy Benefits
    • Steps to go Solar

location marker iconThe Stitt Group
1301 South 8th Street
Rogers, AR 72756

telephone iconTel: 479.636.8745
Fax: 479.636.2572

email iconinfo@thestittgroup.com

facebook iconLike us on Facebook

Connect on LinkedIn

Houzz LogoFind us on Houzz

Pinterest LogoFind us on Pinterest

Instagram LogoFollow us on Instagram

Twitter logoFollow us on Twitter

Google Plus LogoFind us on Google+

Copyright © 2023 | The Stitt Group | All rights reserved. | Privacy Policy